Last updated: 01-04-2024. From web page: BC Documents.

Southampton & Eastleigh Building Control Partnership – Building Control fees for Non Domestic Extensions, New Build and Alterations – Applicable from 1 April 2024

Non Domestic Extensions, New Build and Alterations

Charges

The charges for building regulation work are required to cover the cost of providing the service.

There are two methods of establishing the charge for building works:

  1. Standard charges.
  2. Individually determined charges.

The charges for the majority of non domestic extensions and alterations are standard charges and are listed in the attached tables.

If the charge for your building regulation work is not listed as a standard charge it will be individually determined.

Application Types

Full Plans Applications – where detailed drawings are being deposited the plan charge plus VAT must accompany the application. The inspection charge will be invoiced after the first inspection.

Building Notice Applications – this is an alterative option to submitting a Full Plans application. If you are making this type of application both the plan and inspection charge plus VAT are payable. This type of application cannot be made where the work is being carried out or affects a workplace.

Regularisation Charge – work carried out without permission attracts a charge equal to 140% of the corresponding Building Notice net charge.

Reduction in Plan Charges

  • Repetitive work may attract a reduction of 25%
  • Multiple type of alterations – where for example an extension and internal alterations are carried out at the same time a 50% reduction of the lower application charge will be given.

Exemption from charges

Works provided for the sole purpose of providing access, accommodation or facilities for disabled persons relating to dwellings and public buildings do not require any application charge.

Payment details

When submitting via www.submitaplan.com; on-line payment may be made after submission, on receipt of a payment link, sent via email. Invoices may be paid online details ofpayment methods listed on the Invoice

Refunds

Where a refund is considered appropriate a deduction will be made for administration and costs incurred. A minimum deduction of £50.96 (includes VAT) will be made.

Further Information

Important notes

These charges have been set by the authority on the basis that the building work does not consist of, or include, innovative or high-risk construction techniques (details available from the authority) and/or the duration of the building work from commencement to completion does not exceed 12 months.

A charge of £64.00 Including VAT may be levied for administering a project where work has ceased on site and when the project has been placed on the council’s archiving system.

The charges have also been set on the basis that the design and building work is undertaken by a person or company that is competent to carry out the relevant design and building work. If they are not, the work may incur supplementary charges.

Individually determined charges

If the work you are carrying out is not listed as a standard charge, the charge will be individually determined.

This method of determining the charge mainly relates to larger schemes and includes the following types of building work:

  1. New or extended non domestic buildings with a floor area exceeding 40m²
  2. Non domestic building where alterations are being carried out where the estimated cost of building work exceeds £50,000.
  3. Any other work not described in the Schedule of Fixed Charges.
  4. A reversion charge for all project types.

If your building work is defined as requiring an individual assessment of a charge you should contact
the following:

 

Contact us

For further advice or assistance please contact the building control office:

Southampton Building Control Office

Email: building.control@southampton.gov.uk


Submitting your application: Applications must be deposited electronically using our on-line submission system: www.submitaplan.com

Standard charges

Table C (Part 1) – All other non-domestic work - extensions and new build

Figures include VAT at 20% (VAT is not payable on a Regularisation Charge

Category Description Building Usage
Other Residential (Hospital, Hotel, etc) Assembly and Recreation Use (School, Health Centre, etc) Industrial and Storage Usage (including Car Parks) All Other Use Classes (including Offices and Shops)
Plan Charge Inspection Charge Plan Charge Inspection Charge Plan Charge Inspection Charge Plan Charge Inspection Charge
1 Floor area not exceeding 10m² 267.00 529.00 267.00 529.00 201.00 464.00 267.00 464.00
2 Floor area exceeding 10m² but not exceeding 40m² 402.00 729.00 402.00 662.00 268.00 596.00 402.00 795.00
3 Floor area exceeding
40m². This work category
will be individually
determined please
contact the building
control office for a
quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote
Contact
Building
Control for a
Quote

Table C (Part 2) – All other non-domestic work - alterations

VAT is calculated at a rate of 20% (VAT is not payable on a Regularisation Charge)

Category Description Full Plans Plan Charge (payment with application) Full Plans Inspection Charge (will be invoiced after commencement)
Net Total inc VAT Net Total Inc VAT
1 Underpinning Works with an estimated cost of works less than £50,000 84.17 101.00 55.67 662.00
2 Window and Glazed Door Replacement - 1-10 Installations per Property 37.50 45.00 97.50 117.00
Window and Glazed Door Replacement - 11 and over Installations per Property 7.530 45.00 195.00 234.00
3 Renovation of a thermal element with an estimated cost of works up to £50,000 151.67 182.00 195.00 234.00
4 Alterations not described elsewhere - Estimated cost less than £5,000 113.33 136.00 195.00 234.00
Alterations not described elsewhere - Estimated cost between £5,001 and £25,000 223.33 268.00 291.67 350.00
Alterations not described elsewhere - Estimated cost between £25,001 and £50,000 335.00 402.00 388.33 466.00
5 Installation of Mezzanine Floor less than 300m² 223.33 268.00 291.67 350.00
6 Office or Shop Fit Out less than 300m² 279.17 335.00 291.67 350.00