To consider the report of the Cabinet Member for Environment and Transport seeking to amend the Itchen Bridge Toll Order to remove the off peak charging period for Class 2 vehicles and to increase the toll for Class 4 vehicles.
Minutes:
DECISION MADE: (CAB 23/24 42532)
On consideration of the report of the Cabinet Member for Environment and Transport, Cabinet approved the following:
(i) To remove the Off Peak charging classification from the Itchen Bridge Toll for Class 2 vehicles and introduce a single charge band for all trips.
(ii) To implement an increase in the Itchen Bridge toll paid by Class 4 vehicles from £25 to £40 and an increase in the associated concessionary rate (for Class 4 vehicles accessing the Local Concession Zone) from £2 to £3.
Supporting documents: